TECHNICAL REFIT DETAILS 2021-2023 (18 months)
• Complete replacement of the main kitchen including all appliances.
• Replacement of all toilets.
• Replacement of both water heaters and installation of a third one.
• Replacement of hot water circulation pump.
• Replacement of fire pump.
• Replacement of drainage pump.
• Replacement of steering pump.
• Replacement of diesel transfer pump.
• Replacement of fresh water pump (2).
• Replacement of two jacuzzi pumps.
• Replacement of main transformer.
• Replacement of water maker.
• Replacement of air conditioning unit and four fan coils.
• Creation of a service battery bank.
• Replacement of the fire suppression system (FM200).
• Replacement of the electric motor for machine ventilation.
• Replacement of battery chargers (3).
• Installation of two Kohler generators in coupling (17 kVA / 35 kVA).
• Replacement of air compressor.
• Replacement of the two main engines long blocks (2).
• Installation of a hydraulic system for bow thruster and windlass.
• Installation of three electric motor controls (ZF).
• Complete replacement of the main 220V/380V electrical panel in the engine room
• Replacement of all sea water valves below the waterline.
• Installation of two ice makers.
• Installation of a laundry room with two washing machines and two dryers.
• Replacement of sounder.
• Replacement of radar (ICOM).
• Replacement of satellite TV antenna (Glomex).
• Replacement of 120m anchor chains with a diameter of 16mm.
• Installation of a video surveillance system with four cameras.
• Creation of a double sunbathing area at the front.
• Creation of a hatch access to the flybridge.
• Replacement of the crane (Opacmare).
• Complete replacement of all exterior upholstery.
• Refurbishment of all interior and exterior furniture.
• Replacement of all switches and electrical outlets.
• Replacement of ceiling and lighting in the guest area.
• Replacement of all faucets.
• Installation of new showers in all guest cabins.
• Replacement of all carpets with new parquet flooring.
• Installation of two LG TVs and one SONY TV.
• Replacement of the sound system in the salon (Cabasse with Yamaha amplifier).
INTERIOR REFIT DETAILS & STERN EXTENSION 2023-2024 (8 months)
• Extension by 1.65m of the complete stern of the yacht (aft deck to hull bottom).
• Addition of large Lockers on port and starboard of the stern for storage.
• Extension by 1.5m of swim platform, for a total of 2.85m with new teak deck.
• Installation of teak stairs from the aft deck to the swim platform on starboard.
• Installation of a new hydraulic and telescopic Gangway on portside.
• New Paint on all stern and swim platform.
• Refit of the main saloon design with new wall panels
• Extension of the Master cabin (main deck) with additional 5m².
• New design in Master cabin, including a very large wardrobe.
• Extension of the Master’s Bathroom, with additional 2m².
• New design in Master’s Bathroom, with large shower, long bathtub et separate toilets.
• Istallation of new TV sets in all cabins and in Master’s Bathroom.
• Transformation of a full beam VIP into 2 x Double cabins with additional Pullman bed.
• Installation of 2 Pullman beds in the Twin cabin.
• Refurbishing of the very large remaining VIP on lower deck.
Disclaimer
The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice. Any vessel that is not U.S. flagged and has not paid U.S. duties cannot be offered for sale to U.S. residents whilst in U.S. waters.